Fuijifilm Rosehill
Warehouse Makegood
Second Project Slider TBA
Second Project Slider TBA
Second Project Slider TBA
Second Project Slider TBA
Second Project Slider TBA
Second Project Slider TBA
Second Project Slider TBA
Second Project Slider TBA
Second Project Slider TBA
Second Project Slider TBA
previous arrow
next arrow

94.18 Tonnes of mixed waste recycled

94.18 Tonnes of
mixed waste recycled

FujiFilm Business Innovation Australia had to undertake a full make good of the 8,000 sq/m industrial eco manufacturing facility at their Rosehill facility. The make good requirements including an entire strip out of the production area, wide format, offices, racking, insulated wall panelling, line marking and making good all mechanical, electrical and fire services back to vacant base building conditions. An initiative that was adopted for this project was diversion of landfill which realised 94.18 tonnes of mixed waste/cool room panels, 3.54 tonnes of concrete diverting from landfill & 50.52 tonnes of steel sent to recycling facilities.  

Fujifilm Rosehill
Make Good

Client:
FUJIFILM Business Innovation Australia Pty Ltd
Approximate Budget: $0.5M

Sector: Industrial Delivery Methodology:
Tender (Design & Construct)

Project Team:
Architect: Lead Architects
Move Management Consultant:
Tilden Consulting Pty Ltd
Head Contractor: UNITA

©Copyright Initial Capital Projects Pty Ltd. All Rights Reserved.

CONNECT

Kieron Hewitt
Managing Director

M 0427 100 001
kieron@initialcap.com.au

29 Park Rd, Cheltenham, VIC 3192

Warehouse(for deliveries)
29 Park Rd, Cheltenham VIC 3192

CONNECT

Kieron Hewitt
Managing Director

M 0427 100 001
kieron@initialcap.com.au

29 Park Rd, Cheltenham, VIC 3192

Warehouse(for deliveries)
29 Park Rd, Cheltenham VIC 3192

©Copyright Initial Capital Projects Pty Ltd. All Rights Reserved.